Skip to content
What matters to you.
0:00
0:00
NEXT UP:
 

Season 45 Episode 3
E3 | Lexington Modern | The Big Dig

About the Episode

Accessibility is at the forefront of this renovation, which requires major changes. A new mechanical space is being created out front and will be connected to the old mechanical space by a new concrete block wall. Out back, a new foundation has been poured for a larger walkout basement. The new HVAC ducts are installed considering the new energy code. Framing for the new elevator begins.

Aired: 10/11/23 | Expires: 07/18/24 | Runtime: 23m 42s