E23 | Dorchester Triple Decker | Finish Work Begins

Season 42 Episode 23
E23 | Dorchester Triple Decker | Finish Work Begins

About the Episode

On the first floor, Tom Silva and Kevin O'Connor reinstall the upper cabinets that survived the fire. Tom teaches the apprentices to trim a window in the kitchen. HVAC contractor James Bouchard shows Richard Trethewey the plan for hot water and heating. Kevin joins Carol and her sister Willie to shop for appliances for all three levels. Mark Ferrante is tiling the first of three bathrooms.

Aired: 05/12/21 | Expires: 05/29/21 | Runtime: 23m 42s