What matters to you.
0:00
0:00
NEXT UP:
 
Top

E4 | Lexington Modern | Engineered for Accessibility

Season 45 Episode 4
E4 | Lexington Modern | Engineered for Accessibility

About the Episode

Great progress is being made on the project house. The primary addition is being framed and the rooms are starting to take shape. A sound deadening wall is built. A lally column is removed and a larger ridge beam is installed to create an open kitchen and dining area. The homeowners choose hardscape finishes based on 3D renderings. An accessible designed bathroom is toured.

Aired: 10/18/23 | Expires: 07/18/24 | Runtime: 23m 42s