What matters to you.
0:00
0:00
NEXT UP:

Episode 20, Season 45<br> E20 | Glen Ridge Generational | QR Construction

Season 45 Episode 20

About the Episode

The new two-story addition is framed, and the front porch is being rebuilt. Painting starts on the new wood windows. An interior wall is framed to straighten out a sag in the upper floor. Exterior colors are chosen, plumbing pipes are isolated from cold weather, and header-less window opening is framed. A foolproof method of laying out plumbing and electrical fixtures is shared.

Aired: 04/17/24 | Expires: 05/02/24 | Runtime: 23m 42s