On June 6, 1933, workers began pouring concrete to build what would become the face of the dam. To move the concrete across the construction site, Chief Engineer Frank Crowe designed a network of cableways to carry material. Pretty soon, a cable would deliver a 20-ton bucket of concrete every 78 seconds!