Arlington Italianate Project 2014: Sod, Garbage Disposers, Crown Molding

HOME & TRAVEL This Old House

A production of  

Recent Episodes

Lexington Colonial | Inspections

Lexington Colonial | Inspections

This Old House

Rough mechanical and rough framing inspections.

30 min.

The Lexington Colonial House | Conservation Concerns

The Lexington Colonial House | Conservation Concerns

This Old House

A covered gutter.

30 min.

The Lexington Colonial House | Exterior Details

The Lexington Colonial House | Exterior Details

This Old House

Kevin meets electrician Allen Gallant and inspector Alix Berube to see what goes into a rough electrical inspection.

Lexington Colonial | Making Connections

Lexington Colonial | Making Connections

This Old House

Roger and landscape designer Tim Lee discuss how the backyard stream affects the landscape plan.

Lexington Colonial | Smart Solutions

Lexington Colonial | Smart Solutions

This Old House

Norm visits the Hancock-Clarke house. 

Lexington Colonial | Colonial Curb Appeal

Lexington Colonial | Colonial Curb Appeal

This Old House

With the front gable wall of the second floor up, roof framing is underway.

30 min.

Schedule

Sunday
3/29/15 4:00 AM
WGBH Create
Monday
3/30/15 10:00 AM
WGBH Create
Monday
3/30/15 6:00 PM
WGBH Create
Monday
3/30/15 10:00 PM
WGBH Create
The Lexington Colonial House | Conservation Concerns Lexington Project 2015: Old to New Lexington Project 2015: Old to New Lexington Project 2015: Old to New

Latest Comments


Related Content

A truckload of fresh sod is rolled out; a replica ceiling medallion made with a 3D printer and a custom copper vent hood are installed; a garbage disposer is selected; a pedestal sink is installed in the powder room.

Food & Wine email from WGBH

 

   

myWGBH