This Old House

HOME & TRAVEL This Old House

A production of  

Recent Episodes

The Lexington Colonial House | New Walk, Old Stone

The Lexington Colonial House | New Walk, Old Stone

This Old House

Kevin finds Roger starting on the new bluestone front walk. Norm finds Mark Ferrante installing porcelain tile in the screen porch.

Lexington Project 2015 | Designer Details

Lexington Project 2015 | Designer Details

This Old House

Custom refrigerator panels are spotlighted.

30 min.

Lexington Project 2015 | Old to New

Lexington Project 2015 | Old to New

This Old House

The progress on the mudroom and kitchen is recapped.

30 min.

The Lexington Colonial House | Conservation Concerns

The Lexington Colonial House | Conservation Concerns

This Old House

A covered gutter.

30 min.

Lexington Colonial | Inspections

Lexington Colonial | Inspections

This Old House

Rough mechanical and rough framing inspections.

30 min.

The Lexington Colonial House | Exterior Details

The Lexington Colonial House | Exterior Details

This Old House

Kevin meets electrician Allen Gallant and inspector Alix Berube to see what goes into a rough electrical inspection.

Schedule

Monday
4/27/15 10:00 AM
WGBH Create
Monday
4/27/15 6:00 PM
WGBH Create
Monday
4/27/15 10:00 PM
WGBH Create
Tuesday
4/28/15 4:00 AM
WGBH Create
Lexington Project 2015: Finishing Details Lexington Project 2015: Finishing Details Lexington Project 2015: Finishing Details Lexington Project 2015: Finishing Details

Latest Comments


Related Content

The exterior paint job at the Brooklyn house is inspected; in the parlor, white-oak flooring is laid and two accent strips of cherry are added as a decorative border; replacement windows are added to the back of the house.

Food & Wine email from WGBH

 

   

Support for WGBH is provided by:
Become a WGBH sponsor

myWGBH