Arlington Italianate Project 2014: Additional Details

HOME & TRAVEL This Old House

A production of  

Recent Episodes

The Lexington Colonial House | Finishing Details

The Lexington Colonial House | Finishing Details

This Old House

Kevin finds Roger and Tim Lee placing the first new plants in the planting plan.

The Lexington Colonial | Mudroom, Ventilation, Kids’ Rooms

The Lexington Colonial | Mudroom, Ventilation, Kids’ Rooms

This Old House

Allen Gallant shows Kevin the new LED ribbon strip lights he’s using under the cabinets.

The Lexington Colonial House | New Walk, Old Stone

The Lexington Colonial House | New Walk, Old Stone

This Old House

Kevin finds Roger starting on the new bluestone front walk. Norm finds Mark Ferrante installing porcelain tile in the screen porch.

Lexington Project 2015 | Designer Details

Lexington Project 2015 | Designer Details

This Old House

Custom refrigerator panels are spotlighted.

30 min.

Lexington Project 2015 | Old to New

Lexington Project 2015 | Old to New

This Old House

The progress on the mudroom and kitchen is recapped.

30 min.

The Lexington Colonial House | Conservation Concerns

The Lexington Colonial House | Conservation Concerns

This Old House

A covered gutter.

30 min.

Schedule

Friday
5/8/15 10:00 AM
WGBH Create
Friday
5/8/15 6:00 PM
WGBH Create
Friday
5/8/15 10:00 PM
WGBH Create
Saturday
5/9/15 4:00 AM
WGBH Create
Lexington Project 2015: Down to the Wire Lexington Project 2015: Down to the Wire Lexington Project 2015: Down to the Wire Lexington Project 2015: Down to the Wire

Latest Comments


Related Content

The new kitchen windows are examined; vertical beaded siding is installed; 150-year-old corbels are replicated; and connecting cast iron waste pipes with a lead and oakum joint is demonstrated.

Sign Up

Subscribe to WGBH Food & Wine Emails

 

   

 

Support for WGBH is provided by:
Become a WGBH sponsor

myWGBH